Our Reports
Standard Operating Procedure On Cooperation And Coordination Between The Nigeria Police Force, Department Of Public Prosecutions Ministry Of Justice Nasarawa State, And The Nigerian Correctional Service For The Diligent And Expeditious Investigation/Prosecution Of Cases In Nasarawa State.
Nasarawa State Criminal Justice Charter
Nasarawa State Administration of Criminal Justice Rules
SOP on Cooperation and Coordination between the Nigerian Police Force, Department of Public prosecutions, Ministry of Justice and the Nigerian Correctional Service for the Diligent Investigation/ Prosecution of Cases in Plateau
Plateau State Criminal Justice Service Charter
Plateau State Administration of Criminal Justice Rules
Access to Justice Parley Report
Budeshi Guideline
Consolidating the Gains of Fiscal Transparency
Education Reports
ICIR – INVESTIGATION: Ghost hospitals, expired drugs, leaking roofs, waterlogged drug stores… the multimillion-naira health centres in the south-east are in tatters
ICIR – INVESTIGATION: Schools for the physically challenged in ruins despite N10.6bn UBEC grant
ICIR – INVESTIGATION: UBEC projects are failing, and public-school students are suffering
Guardian – How contractors fleece government in UBEC school project contracts
Legit.ng – Investigation: How contractors shortchanged Nigerian government as abandoned health centres worth billions of naira litter northern Nigeria
Vanguard -Agency uncovers how contractors execute shoddy jobs for UBEC projects in Anambra
Monitoring Reports
ANAMBRA
KADUNA
- Construction of 2 Classrooms (Reduced size) at Dongida 1, Don Ward, Kajuru LGA
- Construction Of 2 Classrooms (Reduced Size) At Kasuwa Magani, Kajuru LGA
- Construction Of A Block Of 2 Classrooms At Kutemeshe And Shika In Bgwarigiwa LGA
- Construction of 2 Classrooms (Reduced size) at Dongida 1, Don Ward, Kajuru LGA
- Construction Of Two (2) Classrooms Reduce Size Jankasa, Fadan Kagoro, Kaura LGA
- Construction of 2 Classrooms (reduced size) at Dongi
- Renovation Of 2 Classrooms At Sabo Gari, Afogo, Kajurulga
- Renovation Of Two (2) Classrooms At Chikun Village, Chikun Ward, Chikun LGA
- Renovation Of Two (2) Classrooms With Furniture At Garin Kujama, Kujama Ward, Chikun LGA
- Renovation Of Two (2) Classrooms, 35 No. Pupils Furniture And 2 Sets Of Teachers Furniture At Narayi, Narayi Ward, Chikun LGA
LAGOS
Linking Data to Primary Healthcare Centres in Six states
DELTA
- Construction of 3-compartment toilet at Abimbola Gibson Memorial Primary School_2C Barracks
- Construction of 3 compartment toilet at Ire-Akari Primary School, Mushin
- Construction of 3 Compartment Water System Toilet With Wash Hand Basin at Ajiran Community Pry Sch_2C Eti-Osa
- Construction of 3-compartment Water System Toilet With Wash Hand Basin_2CWC Toilet at Ai Alafai Primary School, Surulere LGA
- Construction of 3 Compartment Water System, 8.1KVA Generator with Motorized borehole Plus Reticulation in Sangotedo Pry Sch
Annual Reports
2020 Annual Report
2019 Annual Report
2018 Annual Report
2017 Annual Report